Delivery & lead times
This item is on back order with a 3–4 weeks estimated lead time. Confirm the date before scheduling your installation.
Illustrative product photography. Appearance may vary. Detail view is a crop of the main image.
Insulation · SKU PIR100
Rigid foil-faced PIR board for high-performance thermal insulation in walls, roofs and floors.
£82.50 inc VAT
Back order: estimated 3–4 weeks. Contact the branch to confirm.
Contact the branch to reserve stock and arrange collection before travelling.
Rigid insulation for specified wall, floor and roof systems. Confirm thermal conductivity, fire classification and installation requirements for the exact manufacturer and application before ordering.
Store flat, dry and protected from sunlight. Protect board edges during handling. Do not load or walk on unsupported boards.
| Product code | PIR100 |
|---|---|
| Material | Polyisocyanurate (PIR) |
| Thickness / section | 100 mm |
| Width | 1200 mm |
| Length | 2400 mm |
| Finish | Foil-faced |
| Nominal coverage | 2.88 m² |
| Sold by | board |
| Weight / pack quantity | Confirm with the branch |
Nominal dimensions. Confirm manufacturer certification and suitability for your application before installation.
This item is on back order with a 3–4 weeks estimated lead time. Confirm the date before scheduling your installation.
Plan for kerbside access on firm, level ground. Tell the team about narrow roads, access restrictions or lifting requirements. Pallet and long-load arrangements must be confirmed before delivery.
Collection is available by arrangement with the Manchester branch. Check availability before travelling and bring a vehicle suited to the size and weight of your materials.
Illustrative ratings and comments for this prototype. These are not real customer reviews.
1 illustrative review
The full-size boards make a cutting plan straightforward. Confirm the exact specification and lead time before starting the job.
Building contractor — example
Keep the job moving
Compare alternatives and explore complementary materials. Check suitability against your project specification.